Austin Concrete CompanyAustin Concrete Company

Foundation installation in Austin MN - footings set below frost and walls built to plan

You've got plans drawn and a lot staked, so we dig, form, set the steel and pour a foundation built to match them.

Concrete front steps and sidewalk lead to a white house porch with chairs and a small garden bed.

What does foundation installation involve in Austin?

Foundation installation in Austin, MN covers digging out the site, setting forms and rebar, the steel bars that give concrete its strength, and pouring the footings and walls your new home sits on, and I start from your plans and the inspections they'll go through.

Most of what we pour is flatwork, the driveways, patios and walks around a house, plus a concrete parking lot now and then for a small business, but a foundation is where my dad's line about concrete only getting one shot matters most. The price moves with the type you pick, the size and depth of the dig, how tall the walls run and how much waterproofing the plan calls for, and if you only need something smaller under an addition, concrete footings may cover it. The schedule turns on the city's review of your plans, the inspections between stages and what we find once we're digging, and your written estimate spells out each part so you can see what you're paying for.

How do you know it's time to plan a foundation?

Most foundation calls aren't about a problem you can see yet. They come from people with plans in hand, an addition in mind or an old building that never had a proper base.

  • Your house plans are drawn, and the next thing on the builder's list is someone to pour the foundation.

  • Your lot is surveyed and staked, which usually means it's time to price the dig before anything else gets scheduled.

  • You're planning an addition, and it needs its own foundation that meets up cleanly with the house you have.

  • An old shed or shop heaves and shifts every spring, which usually means it never had footings below frost.

  • A basement wall leaks after every hard rain and patching hasn't held, which can mean the wall needs replacing.

  • Your lender or builder keeps asking who's doing the foundation, because nothing else on the house can start without it.

Call once your plans are close to final rather than waiting for the dig date, because the schedule starts with the city's review of those plans.

What happens when you call about a new foundation in Austin?

Here's how a foundation job runs with us, from the first call to the walk-through, including the city steps that set the calendar before anybody picks up a shovel.

  1. Call and I come out

    You call, and I'm the one who comes out to walk the lot, take measurements and go over your plans with you. We'll talk through block, poured walls or a slab, and which one fits what you're building.

  2. Get a written, itemized estimate

    You get a written estimate that spells out each part of the work, from the dig and forms to the steel and the pour, so nothing about the cost is a mystery. If a number looks high, ask me, and I'll tell you what's driving it and what we could change.

  3. Line up the permit and locates

    Once you say go, we handle the permit paperwork with the city and line up utility locates through Gopher State One at least 48 hours before anyone digs. For a new home, Austin asks you to allow 15 working days for it to review site drawings and plans, and fees are paid and work starts only after the Building Official approves them.

  4. Dig, inspect, pour and walk through

    I'm on site with our crew from the dig through the finish, and the city inspects the footing forms and rebar before any concrete goes in, then the wall forms and rebar before those walls are poured. Before we pack up, we walk the job with you and go over how to look after it.

Get a written foundation estimate for your lot

Send the site address, whether it's a new home and any site drawings you have, and we'll reply within one business day to set up a free on-site estimate, with no obligation.

Hours
Mon–Fri: 7 AM–11 PM, Sat–Sun: 8 AM–10 PM

Block, poured walls, slabs and the ground under them

For poured walls we set forms on the footings, tie rebar inside and fill them with concrete, so each wall comes out as one piece. Block walls are laid course by course on the same footings, with steel and grout in the cores where the plans call for it. A slab skips the basement and sits on the subgrade, the packed ground and base under it, with footings carrying the load at the edges.

The part I won't skimp on is the part you'll never see again. Once the dirt goes back against the walls, nobody looks at the footings, the steel or how well the base was packed, but that's what the whole house sits on. If the budget gets tight, I'd rather trim something you can change later than the dig, the rebar or the time it takes to set forms right.

Ground in Mower County keeps you honest. More than 300 sinkholes have been located across the county, from steep-sided funnels to broad, shallow bowls. That's a countywide count, not a finding about your lot, and I won't guess about your ground from the truck, so I come out and look myself. We're based in Austin and do the same foundation work in Albert Lea, Stewartville, Kasson and the cities around them.

Foundation questions we hear in Austin

Which foundation type costs the least up front in Austin, MN?

Nationally, a slab-on-grade usually has the lowest first cost, block is typically next, and poured walls generally cost the most. The catch is that a lower first cost can mean more water protection work, which matters most with block. Your written estimate breaks out each part, so you can weigh the types side by side.

How deep do footings need to be in Austin, MN?

Footings in Mower County go at least 3-1/2 feet deep under state rules, because that's how far the ground can freeze here. A shallower footing is allowed only when an engineer who knows soil mechanics backs it up with evidence, so if your plans show one, that design starts with the engineer, and we build to it.

Do I need a permit to build a new foundation in Austin?

Yes, Austin requires a building permit from the City Building Department before work begins to build, enlarge, alter, repair or demolish a building, except for work the city exempts. We handle the paperwork and set up the inspections, and the city's plan review time is in our steps above. If you'd like to read the city's requirements yourself, they're in Austin's new home permit information.pdf).

Who is allowed to build a house foundation in Minnesota?

A contractor you hire directly for more than one special skill, such as excavation and concrete work, needs a state residential building contractor or remodeler license, and one who needs that license can't get a building permit without it. We're licensed and insured, and you can check any contractor through the Minnesota Department of Labor and Industry online or at 651-284-5069. State law also requires builders and remodelers to warrant a home against major construction defects, meaning damage to the load-bearing part of the home, for ten years, with natural disaster damage left out.

How long does foundation installation take in Austin?

The calendar is set mostly by the steps before and between pours, not by the pour itself. For a new home that means the city's plan review, the utility locates and the inspections of the footing and wall forms, all covered in our steps above. What we find once we're digging can move it too, and I'll tell you what I'm seeing as we go.

What is the best way to keep a new foundation from leaking?

Start by picking the type with water in mind, because poured walls have the fewest leak paths and block needs the most waterproofing care. On a slab, keeping water out depends on the vapor barrier, the sheet under the concrete that blocks ground moisture, and on how the site drains. I'll go over which fits your lot when I come out.

Send your plans for a foundation estimate

Call (507) 509-6215 or use the form while your plans are still on paper, so there's time to weigh block, poured walls and a slab before anything's locked in.

Mon–Fri: 7 AM–11 PM, Sat–Sun: 8 AM–10 PM

(507) 509-6215Request an estimate